地暖施工的前提条件有哪些?
来源:http://www.jndngs.com 日期:2019-12-26 发布人:admin
  一份可靠、科学、可行的地暖安装方案,它应该充分考虑到地暖施工的前提条件,主要有以下几点:
  A reliable, scientific and feasible installation scheme of floor heating should fully consider the preconditions of floor heating construction, mainly including the following points:
  1、完整的地暖安装方案已经出具,并且进行了施工组织设计,已进行技术交底,施工力量和机具等,能保证正常施工。
  1. The complete floor heating installation plan has been issued, and the construction organization design has been carried out, technical disclosure has been carried out, construction force and machines and tools, etc., to ensure normal construction.
  2、施工现场、施工用水和用电、材料储放场地等临时设施,能满足施工需要。
  2. Temporary facilities such as construction site, construction water, electricity and material storage site can meet the construction needs.
  3、地板辐射供暖的安装工程环境温度宜不低于5℃。
  3. The ambient temperature of the installation project of floor radiant heating should not be lower than 5 ℃.
济南地暖
  4、地板辐射供暖施工前,应了解建筑物的结构,熟悉设计图纸、施工方案及其它工种的配合措施。
  4. Before the floor radiation heating construction, the structure of the building shall be understood, and the design drawings, construction scheme and other coordination measures of work types shall be familiar.
  5、地暖安装人员应熟悉管材的一般性能,掌握基本操作要点,严禁盲目施工。
  5. The floor heating installation personnel shall be familiar with the general performance of the pipe, master the basic operation points, and prohibit blind construction.
  6、加热管安装前,应对材料的外观和接头的配合公差进行仔细检查,并清除管道和管件内外的污垢和杂物。
  6. Before the installation of the heating pipe, the appearance of the material and the fitting tolerance of the joint shall be checked carefully, and the dirt and sundries inside and outside the pipe and pipe fitting shall be removed.
  7、地暖安装方案实施过程中,应防止油漆、沥青或其它化学溶剂污染塑料类管道。管道系统安装间断或完毕的敞口处,应随时封堵。
  7. During the implementation of floor heating installation plan, the plastic pipes shall be prevented from being polluted by paint, asphalt or other chemical solvents. The open area where the pipeline system installation is interrupted or completed shall be blocked at any time.